Abstract
A metric is proposed to predict the risk of a project's failure. It is a simplification of a metric proposed in an earlier paper. The metric is based on findings made during an architecture review of the project. An empirical study involving thirty-six large industrial telecommunications projects is included, describing our experience using this metric.