Proceedings. IEEE/WIC/ACM International Conference on Intelligent Agent Technology (IAT 2004)
Download PDF

Abstract

Flexible planning and realisation as well as fast reorganisation after interferences during continuous work are indispensable requirements for a competitive position on the market in the industrial sector. In this paper we present an agent-based generic solution for the planning and observation inside the steelwork "V?lklingen" of the German steel company "Saarstahl AG", a global respected steel manufacturer. For a given daily target schedule for the steelwork an initial solution - meaning executable schedules for each aggregate inside the steelwork - is obtained by a combined distributed planning and scheduling algorithm in which each aggregate represented as an agent calculates the set of possible solutions locally and a further agent does the optimisation, where the objective function can be altered by a user. The real-time system then monitors the plan execution and recognizes potential faults in the production process as soon as possible and gives suggestions of how to react on these operational faults.
Like what you’re reading?
Already a member?
Get this article FREE with a new membership!

Related Articles